The Mid-Jordan TRAX parking garages consist of two four-level garages that have a combined square footage of 392,000 sq.ft. with approximately 750 stalls. Hunt Electric was awarded a design-build contract for both garages by Ralph L. Wadsworth Construction. The scope of work included lighting, raceways for all security cameras, the installation of a complete "Call-for-Assistance" system, a fire alarm system and snowmelt on one of the included entry/exit ramps. All conduit work had to be concealed in the post-tension concrete slabs which required a large amount of planning and coordination between Hunt Electric and Ralph L. Wadsworth Construction. The project was completed meeting the strict quality standard of UTA and on schedule to coincide with the grand opening of the Mid-Jordan TRAX line.