The Central Parking Garage, located in the Business Loop is the newest parking addition to the University of Utah Campus. Students and faculty have more than 800 stalls to utilize for campus activities. An interesting feature is that the top level of the garage is a fully-turfed soccer practice field. The infrastructure scope of work consisted of removing the high voltage duct bank and installing new duct bank conduit - all while keeping the road accessible to campus users. Our Transmission & Distribution team safely removed the existing high voltage duct bank wiring, pulled and installed a new high voltage transformer, sectionalizer, and switch to energize the new garage. New call-for-assistance phones were installed by our I.T.S./Data Communications team, and an emergency backup generator was installed. Conduit raceways were also installed for all CCTV and access control systems.
RELEVANT EXPERIENCE
EIGHT IN-HOUSE DIVISIONS
A SINGLE POINT OF ACCOUNTABILITY
Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.