Hunt Electric provided the electrical design for this 972 stall, four-level parking structure that accommodates the parking needs for Infinity Field, the adjacent 12-story office building. It was on schedule and 18% under owner's preliminary budget at $9,516 per stall. The schedule was very aggressive with a six-month construction window.
The project consisted of 121 LED parking garage luminaries,12 double-head parking lot lights on the top of the structure, LED egress lighting, and a 200 amp 277/480 volt main service. One of the challenges is to maintain the existing parking lot lightning throughout the duration of the project. The structure was built in two phases to reduce the impact to the existing tenants of Infinity Field.