Hunt provided electrical work to within five feet of the building, provided demo of existing electrical work, temporary power, relocation of UTA TRAX substation and provided grounding mat, provided sleeves through bridge, and conduits out of the generator and future generators. Additionally, the scope of work for the 575,000 sq. ft., five-level parking structure included 1,390 parking stalls and over 820 light fixtures. This was installed using an ‘all cast in place’ wiring method.