Remove and reuse approximately 31, 70’-115’ structures and re-string 10,000 of transmission conductor in a new tailings ponds. The second phase of this project included removal and re- installation of 45, 75’ to 125’ transmission structures to re-feed an existing substation and decant barges, and a switch rack. The worksite included working around other contractors building new roads and installing de-watering equipment.