Cuprum Mine Loop 44 KV Re-Route

Hunt Electric performed the decommission, move and recommission of the existing 46kV to 13.8 kV substation located at the 6880 level of the mine. Our scope also included the construction of new ground grid, new fencing and new 100’ wood pole. The team also installed a 46kV transformer, assembled a 13.8 kV breaker, reconnected and tested the substation. This project also includes the construction of new a 46 kV line for 1 mile to feed the substation with 90–120’ 2 and 3 pole transmission structures.


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.