Kennecott Frisco Substation

Hunt Electric performed the decommission, move and recommission of an existing 46kV to 13.8 kV substation located near the mine cone crusher. Our scope included the removal of fencing and an overhead 120’ pole feeding substation, and all cabling. The team also transported a 46 kV transformer to new location, constructed a new ground grid, new fencing and a new 100’ wood pole. We also assembled the 46kV transformer and 13.8 kV breaker, reconnected and tested the substation.


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.