Cryq Energy Lightning Dock Substation

Hunt Electric was responsible for the design, procurement and installation of a 16 MW, 24.9 kV to 13.8 kV substation. The substation is comprised of a 6-way 25 kV switch that fed 5 distribution transformers stepping down 24.9 kV to 480 V. These transformers have fully integrated re-closers with integration into an existing utility 24.9 kV transmission line. Controls are being designed to integrate with the utility, the new geothermal plan, as well as existing generation on-site to provide protection and control for all parts of generation plant. Design coordination is held between the owner, the utility and the manufacturers if generation equipment is in multiple countries.


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.