The Hunt High Voltage Crew built out a 3 Mile, 46kV Transmission and 12kV underbuilt Line Direct to Brigham City through our long term On-Call contract. This project included building and setting 45, 75’ ductile iron poles in some very swampy terrain. All of our equipment was required to have tracks to keep from sinking, with the water table less than 2’ under the surface. This line will energize a new substation at the west end of town and tie in a full loop of the distribution system around the city for redundancy and reliability.