This project consisted of a 22MVA substation. 46kV to
12.47kV with four circuits originating from it. Hunt Electric performed all
civil work including the installation of all underground grid, piers and pads.
Installed all 3” and 5” aluminum bus. Circuit switcher on high side. Low side
breaker and 4 feeder breakers. AC/DC circuits in the control house.