Hunt Electric provided electrical work to within five feet of the building, provided demolition of the existing electrical work, temporary power, relocation of UTA TRAX substation and grounding mat, sleeves through bridge, and conduits on existing and future generators. Additionally, the scope of work for the 575,000 sq. ft., five-level parking structure included 1,390 parking stalls and over 820 light fixtures. This was installed using 'all cast in place' wiring method.