Mt. Olympus Presbyterian Church

Hunt Electric’s Sustainable Energy division was selected to design and installed a 71.44 KW DC array consisting of 188 solar modules. This system will generate an anticipated 91,724 kilowatt-hours (kWh) of electricity per year. The sustainability team faced the challenge of installing a roof-mounted system on an aging roof that had difficulty bearing its weight. To ensure the safety and reliability of the system, Hunt worked with the racking manufacturer and their structural engineer to develop a customized hybrid attached ballast system that was light enough for the roof.

A significant portion of the system’s cost was funded by Rocky Mountain Power’s Blue Sky Program which supports renewable energy. 


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.