The Hunt Electric Technology team provided design-build services for all Podium’s technology needs, including AV and structured cabling design and installation.
The centerpiece of Hunt Electric’s audiovisual (AV) work on Podium Headquarters Building II is the video wall we installed. This six-by-six video wall is 6 ½ feet tall by 12 ½ feet wide. The wall’s high-resolution capability gives a captivating video experience to all employees in the 300-seat space. And the video wall is easily transformed into an entertainment center that can display movies, sporting events, gaming activities, and employee-created music videos.
We used NVX AV over IP technology throughout the building to provide the ultimate flexibility and scalability for AV presentations. Hunt worked closely with the manufacturer, Planar, to install the TVF video wall. We worked directly with the Podium IT team to ensure flawless integration with their other systems. We deployed AV technology throughout the building including several training rooms, and in their breakroom all-hands area.
The Audiovisual team
also collaborated closely with Hunt Electric’s Datacom and Electrical
departments.