Wadsworth Brothers Construction selected Hunt Electric in the design phase of the project as the design-build contractor. The scope of work included the demolition of the existing six-story building and reconstruction of the new 11-story parking structure. The project was designed with an all exposed conduit system that included lighting, security raceway, generator backup and fire alarm. The design also included the electrical system for two elevators.


RELEVANT EXPERIENCE

EIGHT IN-HOUSE DIVISIONS

A SINGLE POINT OF ACCOUNTABILITY


Since 1986, Hunt Electric has built a solid reputation of providing a wide range of industry-leading services for commercial, industrial, and infrastructure projects throughout the Intermountain West. With our eight in-house divisions, we can assist our clients with any need they have with a single point of accountability.