  • General Contractor:
    Direct-to-Owner
  • Owner:
    Kennecott Utah Copper
  • Location:
    Bingham Copper Mine, Utah
  • Contract Type:
    Bid-Build

Designed and built 3,200 feet of 46kv line around the Kennecott east mine location near the mine landslide. Dug frame and set three 85-foot H-frame structures and five single pole tangent structures. Installed anchors to support dead-end and angle structures. Strung, sagged, and clipped into the new structures 397acsr conductor. Installed 46kpf switch allowing for line isolation. Verified phasing on existing line and kept phasing straight on new line.

Services Provided:  Transmission & Distribution