Orem Costco

  • General Contractor:
    REC Solar
  • Owner:
    Costco
  • Location:
    Orem, UT
  • Contract Type:
    Design-Build

Design and installation of a 551.2kW, 2,080-panel solar array on the roof of Costco in Orem, UT. Work included site preparation and clean up, demolition, excavation, fencing, painting, grounding and utility outage. Installations included a new inverter pad, wire ways, racking, cable trays, and the complete monitoring system. All work was completed per design documents and per local and relevant national electrical codes. 

Services Provided:   Electrical, Solar Energy