Hunt Electric


BIM Hunt Electric University Hospital

Building Information Modeling (BIM)

Hunt Electric utilizes Revit MEP and AutoCAD MEP for 3D Modeling. We provide all of the BIM design, modeling, collision detection services and lighting analysis in-house.

Utah Electrical BIM Contractor City Creek Block 76 BIM

Experts in BIM Technology:
BIM technology was crucial in the successful delivery of the City Creek Center Block 76 Site and Parking Structure projects located in Salt Lake City. 

Building Information Modeling
The true value of BIM goes beyond 3D modeling and clash detection. It provides architects and AEC firms with a better way to “sell” new projects/buildings. The most valuable aspects of BIM are in the organization and communication of complex information in a way that enables every team member to process and evaluate the information. The associated aspects of collaboration, life-cycle building management, and total cost of ownership are enhanced and refined in ways that were previously unachievable. Hunt Electric has fully integrated the BIM strategy into its design and construction processes.


Hunt Electric finds value in using BIM technology to improve productivity, reduce changes, and identify conflicts early in design and construction. The end result amounts to cost savings for the owner, reduced construction time, and higher quality.