Hunt Electric


642kW Solar Array

  • General Contractor:
    Hunt Electric
  • Location:
    Salt Lake City, Utah
  • Contract Type:

The scope of work included 2,676 Aleo 240 watt modules connected to 48 Power One, three-phase inverters mounted on the roof. There are 223 strings of 12 modules with 4 or 5 strings connected to each inverter. Also included are two 400 A and four 200 A AC panels connected to an 800 A disconnect switch and one 100 AC panel connected to a 60 A disconnect switch. In addition, a weather station to monitor ambient temperature, cell temperature and irradiance was incorporated into the project.

Services Provided: Design-Build, Electrical, Solar Design

Quick Solar Facts:The additional power generated by the solar panels is the equivalent of:

  • 74.2% of the owner's electricity bill 
  • The carbon sequestered annually by 501 acres of forests
  • CO2 emissions from 68,568 gallons of gas consumed
  • Greenhouse gas emissions avoided by recycling 229 tons of waste which would otherwise go in the landfill